Aurangabad–Sillod, NH-753F

Rehabilitation and upgradation of the existing two-lane highway to four lanes with divided carriageways from Aurangabad to Sillod on NH-753F.

Aurangabad–Sillod, NH-753F
Client
MoRTH / PWD
Location
Chhatrapati Sambhajinagar, Maharashtra
Contract value
₹395.32 crore
Scope
Two-lane to four-lane with divided carriageways
Delivery model
EPC
Status
Completed
48.3 km Three sections
4 lanes Divided carriageway
₹395.32 cr Contract value
EPC Delivery model

[01] About the project

NH-753F runs north from Chhatrapati Sambhajinagar (Aurangabad) through Sillod. RKC rehabilitated and upgraded the existing two-lane highway to four lanes with divided carriageways, for MoRTH through PWD (NH), in EPC mode.

The four-lane divided highway towards Sillod
The four-lane divided highway towards Sillod

The work covered three sections of the highway: km 0.000–21.000, km 26.300–47.500 and km 54.500–60.630, about 48.3 km in all.

Scope of work

  • Upgrading of the two-lane highway to four lanes with a divided carriageway
  • Rehabilitation of the existing pavement
  • Bridges, culverts and drainage
  • Junctions, service roads, road furniture and safety works

Two directions, kept apart

The corridor serves the city's industrial belt and the farming towns to the north. Dividing the carriageway separates the two directions of traffic and takes the head-on risk out of overtaking on a busy road.