SH-319 Wani–Kayar–Purad Road
Improvement of the Wani–Kayar–Purad road on SH-319 over 23.5 km in Yavatmal district, under the Central Road Fund — completed ahead of the scheduled timeline.
- Client
- Public Works Department of Maharashtra
- Location
- Yavatmal, Maharashtra
- Contract value
- ₹48.36 crore
- Length / span
- 23.5 km
- Scope
- Improvement of SH-319, Km 0/00 to 23/500, under CRF
- Delivery model
- EPC
- Status
- Completed
- Completion
- Completed ahead of schedule
[01] About the project
SH-319 links Wani, Kayar and Purad in Yavatmal district, in the Vidarbha region of eastern Maharashtra. RKC improved the road from Km 0/00 to Km 23/500 for the Public Works Department of Maharashtra, under the Central Road Fund (CRF), in EPC mode.
The work was completed before the scheduled timeline, bringing faster, safer connectivity to the villages along the route.
Scope of work
- Improvement of 23.5 km of state highway
- Flexible pavement, drainage and cross-drainage works
- Road safety works, signage and markings
Built around the landscape
The route runs through forest and farmland. Pavement, structures and carriageway were planned to meet the design life without disturbing the forest and natural setting around the road.